MGN 664 (M+F) Amendment 1: Certification process for vessels using innovative technology

Published 22 September 2023

© Crown copyright 2023

This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/version/3 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: [email protected].

Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned.

This publication is available at https://www.gov.uk/government/publications/mgn-664-mf-amendment-1-certification-process-for-vessels-using-innovative-technology/mgn-664-mf-amendment-1-certification-process-for-vessels-using-innovative-technology

This document provides updated guidance on how to process an application for the certification of UK vessels wherever they may be, or other vessels operating in UK waters that use Innovative Technology or where a risk-based approach is used. Amendments include removal of the certification plan, simplification of content/terminology/headings and re-organisation of information contained.

1.1 This guidance supplements prescriptive regulations that may not cover all aspects of Innovative Technology, and supports goal-based regulations and established survey, inspection, and certification processes.

2.1 The intent of this document is to provide a certification process for vessels using Innovative Technology or where a risk-based approach is used to address safety, environmental and/or security aspects of the technology.

2.2 Innovative Technology is either a new technology or a technology being re-purposed for a new function, where the associated risks to safety, environment and/or security may not be suitably addressed by current regulations, codes or good practice. Innovative Technology includes emission reduction, autonomy and other forms of ‘smart’ marine technology whose risks may not be sufficiently managed to acceptable levels solely by the application of current MCA accepted maritime regulations, codes, standards or good practice.

2.3 This process supplements prescriptive regulations and MSC.1/Circ.1455 that do not cover all aspects of the technology and supports goal-based regulations and established survey, inspection, and certification processes.

2.4 The MCA may publish separate, supplemental guidance to manage the risks associated with a specific Innovative Technology. Any supplementary guidance should be considered in conjunction with this MGN.

2.5 Where a vessel falls within the scope of the International Convention for the Safety of Life at Sea (SOLAS) regulations II-1/55, II-2/17 and III/38 on Alternative Design and Arrangements, should be considered through the related IMO Guidelines such as MSC.1/Circ.1455 and applications made through MSF 1261 process available on Gov.uk.

3.1 This guidance applies to UK vessels wherever they may be and all non-UK vessels in UK waters, through the application of The Merchant Shipping (Load Line) Regulations 1998 that apply to UK ships wherever they may be and non-UK ships while in UK waters. This guidance does not apply to ‘pleasure vessels’ as defined within The Merchant Shipping (Survey and Certification) Regulations 2015 as amended however, the extent of application of these guidelines for pleasure vessels using Innovative Technology should be discussed with the MCA at the project stage.

3.2 Additional or alternative requirements may apply to vessels operating in categorised waters (as defined in MSN1837 as amended), and/or operating within the jurisdiction of local harbour authorities. Early engagement with the relevant authorities is required to seek an advanced agreement on the requirements.

3.3 Acceptance of operation within the UK waters, does not remove any reporting obligations or additional requirements that may be required by the local port state when operating outside of UK waters.

3.4 Non-UK vessels to which this MGN applies wishing to operate in UK waters, are required to seek agreement from the UK administration prior to operation. Contact Headquarters Inspection Operations by email [email protected].

4.1 Throughout the certification process, the MCA may authorise a Recognised Organisation (RO), through a Project Specific Authorisation, to undertake statutory surveys, design appraisal, risk assessment appraisal and certification on its behalf which fall outside the scope of the RO General Agreements with MCA. This will be agreed upon in advance of works commencing, referring to stages in Table 1 as appropriate. It will be subject to the terms and conditions stated in any supplementary MCA-RO agreement and Project Specific Authorisation relating to survey and certification involving maritime Innovative Technology. RO’s are not authorised to issue Exemptions on behalf of MCA.

4.2 Certifying Authorities (CA) and Fishing Vessel Certifying Authorities (FVCA), are authorised by the MCA to examine and certificate small (under 24m) commercial vessels and fishing vessels in accordance with the Codes of Practice as detailed within their CA agreements with MCA. Certifying Authorities may undertake design and risk assessment appraisal, but are unable to accept, survey or certificate for innovative elements in scope with MGN 664 or issue exemptions. More information on CA’s can be found in MIN 538 and Gov.uk for FVCA’s.

4.3 The RO or CA may support stages of the certification process in a consultancy manner. To ensure impartiality, such ‘consultancy’ can only be provided by individuals with no role in, or influence on, the certification of the design. In either case, the MCA should be informed of the level and nature of RO/CA support and its scope as early as possible.

5.1 Upon the decision to adopt Innovative Technology, first contact should be made with the local Marine Office. For non-UK vessels wishing to operate in UK waters, please contact Headquarters Inspection Operations by emailing [email protected]. Details of office contact details including maps of office coverage are on Gov.uk website. The local Marine Office and Inspection Operations will liaise with MCA Headquarters Survey Operations for Innovative Technology elements as required.

5.2 The level of assessment and detail required will be proportional to the risk associated with the project; the level of proportionality will consider items such as complexity and area of the operation, vessel type and size. As a result, not all stages or documentation may be required. This will be discussed during the initial stages of the project with MCA.

5.3 Voluntary compliance with the International Safety Management (ISM) Code should be sought where it is not mandated. The ISM Code incorporates a large portion of typical outputs from a risk-based approach such as controls/measures/checklists etc. and provides an internationally recognised process of capturing risk management, change management, processes and procedures including MCA requirements e.g., loss of power drills, training, maintenance etc which are incorporated into the Safety Management System and Certification. Some Countries already mandate ISM for Innovative Technology vessels as such, voluntary compliance may aid operations in non-UK waters in the future.

5.4 Table 1 illustrates the process of acceptance for the Innovative Technology aspects which come within the Certification framework of a vessel. It shows the stages of assessment, and the details required for each of the stages under discussion/consideration for MCA and the applicant. It’s important that completed, detailed documents as defined in the Approval Basis are submitted; incomplete or missing documents may lead to delays. Note the application process is iterative as such, clarification or further evidence may be needed for any submission documents provided.

5.5 As an alternative to Table 1, MSC.1/Circ.1455 Annex Figure 2 may be used.

5.6 For vessels using Innovative Technology built and operating prior to the issue of MGN664, certification will still use the process outlined in Table 1. As built details of the vessel are to be provided including evidence of the vessel’s compliance with prescriptive regulations, substantiated with supporting documentation for management of risks from the innovative elements. The information provided will be considered when agreeing the level of assessment remaining.

6.1 Table 2 describes the various documents expected for each application and the typical minimum content; these will be discussed at the stages as indicated in Table 1:

6.2 All master copies of in-service documentation required by the Approval Basis are produced, maintained, and updated by an appropriate person.

6.3 As a minimum the In-Service Documentation should include:

6.4 All in-service documentation should be available for all operators of the vessel.

Survey Operations Maritime and Coastguard Agency Bay 2/20 Spring Place 105 Commercial Road Southampton SO15 1EG

Telephone: +44 (0)203 81 72190

Email: [email protected]

Website: www.gov.uk/mca

Please note that all addresses and telephone numbers are correct at time of publishing.